Phase Zero September 8th – Production Trading in all NMS test stocks.
What connections are being used?
Production Sessions.
What Symbols are Active?
All NMS test Symbols: ATEST, ATEST.A, ATEST.B, ATEST.C, CBO, CBX, CTEST, IBO, IGZ, NTEST, ZAZZT, ZBZX, ZBZZT, ZCZZT, ZEXIT, ZIEXT, ZJZZT, ZTEST, ZVV, ZVZZT, ZXIET, and ZXZZT.
What is the schedule?
| Time (Eastern) | Trading Status |
| 7:30A | Session Available |
| 8:00A | Pre-Market |
| 9:30A | Market |
| 4:00P | Post-Market |
| 5:30P | Post-Market Ends |
| 6:00P | Session Closed |
Quote and Trade Reporting?
MEMX will be connected to the Production SIP. The MEMX SIP Participation ID is “U”.
MEMOIR multicast details
| Data | Multicast Address | Port |
| MEMOIR Depth A | 233.142.18.1 | 19780 |
| MEMOIR Depth B | 233.142.18.33 | 19780 |
| MEMOIR Top A | 233.142.18.2 | 19796 |
| MEMOIR Top B | 233.142.18.34 | 19796 |
| MEMOIR Last Sale A | 233.142.18.3 | 19788 |
| MEMOIR Last Sale B | 233.142.18.35 | 19788 |
Gap Fill
| Data | Target IP | Port | Credentials (user:password) |
| MEMOIR Depth | 74.119.48.17 | 21060 | memoirdepthreplay:memoirdepthreplay |
| MEMOIR Depth | 74.119.48.22 | 21060 | memoirdepthreplay:memoirdepthreplay |
| MEMOIR Top | 74.119.48.19 | 21076 | memoirtopreplay:memoirtopreplay |
| MEMOIR Top | 74.119.48.24 | 21076 | memoirtopreplay:memoirtopreplay |
| MEMOIR Last | 74.119.48.18 | 21068 | memoirlastreplay:memoirlastreplay |
| MEMOIR Last | 74.119.48.23 | 21068 | memoirlastreplay:memoirlastreplay |
Snapshot
| Data | Target IP | Port | Credentials (user:password) |
| MEMOIR Depth | 74.119.48.20 | 22060 | memoirdepthsnapshot:memoirdepthsnapshot |
| MEMOIR Depth | 74.119.48.25 | 22060 | memoirdepthsnapshot:memoirdepthsnapshot |
| MEMOIR Top | 74.119.48.21 | 22076 | memoirtopsnapshot:memoirtopsnapshot |
| MEMOIR Top | 74.119.48.26 | 22076 | memoirtopsnapshot:memoirtopsnapshot |
| Mode ID | Description |
|---|---|
| S | Stream Mode |
| R | Replay Mode |
| T | Snapshot Mode |
Phase 1 September 21st – 7 Live symbols.
What Symbols are Active?
ACST, BB, ED, F-B, GOOG, ICSH, XOM
Phase 2 September 29th– All NMS Symbols Active